name: project-analyze
description: Perform comprehensive analysis of project plan, PRD, and epic structure to identify issues before execution begins
disable-model-invocation: false

description: Perform comprehensive analysis of project plan, PRD, and epic structure to identify issues before execution begins.

The user input to you can be provided directly by the agent or as a command argument - you MUST consider it before proceeding with the prompt (if not empty).

User input:

$ARGUMENTS

Analyze project planning artifacts for consistency, completeness, and feasibility before moving to epic-level work.

  1. Load all project artifacts:

    • project.md (specification)
    • PRD.md (requirements document)
    • epics.md (epic breakdown)
    • project-roadmap.md (if exists)
    • architecture.md (system design with embedded research)
    • project-landscape-overview.md (if exists - brownfield scan)
    • If core files missing: ERROR "Required files not found. Run /project-plan first"
  2. Multi-dimensional analysis:

    A. Strategic Alignment

    • PRD goals match project.md vision?
    • Success metrics measure stated goals?
    • Scope aligns with constraints?
    • Research findings incorporated?

    B. Epic Coherence

    • Epic boundaries logical and clear?
    • Each epic delivers standalone value?
    • Dependencies correctly identified?
    • No gaps between epics?
    • No overlapping responsibilities?

    C. Scope Feasibility

    • Total scope matches scale estimate?
    • Timeline realistic for scope?
    • Resource needs identified?
    • Technical risks addressed?

    D. Requirement Coverage

    • All PRD requirements mapped to epics?
    • All user problems addressed?
    • Non-functional requirements distributed?
    • Edge cases considered?

    E. Risk Assessment

    • Critical risks have mitigation?
    • Dependencies create bottlenecks?
    • Technical unknowns identified?
    • Fallback plans exist?
  3. Deep-dive checks:

    Epic Boundary Analysis

    code
    For each epic pair:
    - Check for overlap (same requirement in multiple epics)
    - Check for gaps (requirements not in any epic)
    - Validate dependencies (A needs B but B needs A?)
    - Assess coupling (too tightly coupled to split?)
    

    Requirement Traceability

    code
    For each requirement in PRD:
    - Which epic implements it?
    - Is success criteria defined?
    - Can it be tested/validated?
    - Priority clear?
    

    Scale Validation

    code
    Sum all epic story estimates:
    - Level 1: Should be 1-10 total
    - Level 2: Should be 5-15 total
    - Level 3: Should be 12-40 total
    - Level 4: Should be 40+ total
    - Flag if mismatch
    
  4. Generate analysis report:

    CRITICAL: Load and follow the template exactly:

    code
    .speck/templates/project/project-analysis-report-template.md
    

    Write output to: [PROJECT_DIR]/project-analysis-report.md

  5. Severity classification:

    • CRITICAL: Blocks project execution
    • HIGH: Will cause significant problems
    • MEDIUM: Should be addressed before starting
    • LOW: Can be fixed during execution
  6. Generate actionable fix commands:

    code
    ## Suggested Fixes
    
    For epic overlap:
    /edit epics.md [specific edit]
    
    For missing requirements:
    /edit PRD.md [specific section]
    
    For scope issues:
    Consider splitting epic E003 into two
    
  7. Save report as [PROJECT_DIR]/project-analysis-report.md

  8. Output summary:

    code
    ✅ Project Analysis Complete!
    
    Status: [Ready/Issues Found]
    
    Summary:
    - Strengths: [X] items
    - Issues: [Y] items ([Z] critical)
    - Coverage: [N]% requirements mapped
    
    Critical Issues:
    1. [Issue if any]
    2. [Issue if any]
    
    Next Steps:
    [If Ready]:
    - Proceed with epic planning
    - Start with: /epic-specify "E001: [Name]"
    
    [If Issues]:
    - Fix critical issues first
    - Re-run /project-analyze
    - Then proceed with epics
    
    Full report: project-analysis-report.md
    

This ensures the project plan is solid before investing effort in epic-level planning.