TDD GREEN Phase
Version: {{VERSION}}
When to Use
- •RED phase test has been verified as failing
- •Proceeding autonomously from RED phase
- •Implementing feature to pass test
GREEN Phase Objective
Write the minimum code to make the test pass.
Workflow
Step 1: Understand Test Requirements
- •What behavior is expected?
- •What inputs does test provide?
- •What output/result does test expect?
Step 2: Plan Minimal Implementation
Include:
- •Minimum logic needed
- •Required data structures
- •Expected return values
Avoid:
- •Features not in test
- •Abstractions not yet needed
- •Premature optimization
Step 3: Implement to Pass Test
Provide single code block:
code
TASK: [Brief description] STEP 1: [Open implementation file] STEP 2: [Navigate to location] STEP 3: [Add implementation code] STEP 4: [Explanation] STEP 5: [Save file] STEP 6: [Run test command] STEP 7: [Verify test PASSES] STEP 8: [Report back: Did test pass?]
Step 4: Verify and Proceed
If test passes: Proceed to REFACTOR phase If test fails: Revise implementation, repeat If other tests fail: Fix regressions first
Best Practices
YAGNI (You Aren't Gonna Need It)
Good: Implements exactly what test requires Poor: Implements untested features "just in case"
Simplest Thing That Works
code
Test: Function should return sum of two numbers WRONG: Generic calculation engine with plugins RIGHT: Function returns a + b
Hard-Code First, Generalize Later
code
Test expects result: 5 Implementation: return 5 Next test expects different result -> Now implement real logic
Common Mistakes
- •Over-Implementation - Adding features not required
- •Premature Abstraction - Creating abstractions before needed
- •Ignoring Test Failure Details - Not reading expectations
- •Breaking Existing Tests - Run full suite
Implementation Strategies
| Strategy | When | Example |
|---|---|---|
| Fake It | Simple test | return 5 |
| Obvious | Clear solution | return a + b |
| Triangulation | Unsure how to generalize | Multiple tests force generalization |
Checklist Before REFACTOR Phase
- • Target test PASSES
- • Implementation is minimal
- • No existing tests broke
- • Code is understandable
- • No untested features added
Resources
- •
resources/green-phase-checklist.md - •
resources/minimal-implementation-guide.md - •
resources/triangulation-examples.md
End of TDD GREEN Phase Skill