Conductor Status
Display the current status of the Conductor project, including overall progress, active tracks, and next actions.
Use this skill when
- •Working on conductor status tasks or workflows
- •Needing guidance, best practices, or checklists for conductor status
Do not use this skill when
- •The task is unrelated to conductor status
- •You need a different domain or tool outside this scope
Instructions
- •Clarify goals, constraints, and required inputs.
- •Apply relevant best practices and validate outcomes.
- •Provide actionable steps and verification.
- •If detailed examples are required, open
resources/implementation-playbook.md.
Pre-flight Checks
- •
Verify Conductor is initialized:
- •Check
conductor/product.mdexists - •Check
conductor/tracks.mdexists - •If missing: Display error and suggest running
/conductor:setupfirst
- •Check
- •
Check for any tracks:
- •Read
conductor/tracks.md - •If no tracks registered: Display setup complete message with suggestion to create first track
- •Read
Data Collection
1. Project Information
Read conductor/product.md and extract:
- •Project name
- •Project description
2. Tracks Overview
Read conductor/tracks.md and parse:
- •Total tracks count
- •Completed tracks (marked
[x]) - •In-progress tracks (marked
[~]) - •Pending tracks (marked
[ ])
3. Detailed Track Analysis
For each track in conductor/tracks/:
Read conductor/tracks/{trackId}/plan.md:
- •Count total tasks (lines matching
- [x],- [~],- [ ]with Task prefix) - •Count completed tasks (
[x]) - •Count in-progress tasks (
[~]) - •Count pending tasks (
[ ]) - •Identify current phase (first phase with incomplete tasks)
- •Identify next pending task
Read conductor/tracks/{trackId}/metadata.json:
- •Track type (feature, bug, chore, refactor)
- •Created date
- •Last updated date
- •Status
Read conductor/tracks/{trackId}/spec.md:
- •Check for any noted blockers or dependencies
4. Blocker Detection
Scan for potential blockers:
- •Tasks marked with
BLOCKED:prefix - •Dependencies on incomplete tracks
- •Failed verification tasks
Output Format
Full Project Status (no argument)
code
================================================================================
PROJECT STATUS: {Project Name}
================================================================================
Last Updated: {current timestamp}
--------------------------------------------------------------------------------
OVERALL PROGRESS
--------------------------------------------------------------------------------
Tracks: {completed}/{total} completed ({percentage}%)
Tasks: {completed}/{total} completed ({percentage}%)
Progress: [##########..........] {percentage}%
--------------------------------------------------------------------------------
TRACK SUMMARY
--------------------------------------------------------------------------------
| Status | Track ID | Type | Tasks | Last Updated |
|--------|-------------------|---------|------------|--------------|
| [x] | auth_20250110 | feature | 12/12 (100%)| 2025-01-12 |
| [~] | dashboard_20250112| feature | 7/15 (47%) | 2025-01-15 |
| [ ] | nav-fix_20250114 | bug | 0/4 (0%) | 2025-01-14 |
--------------------------------------------------------------------------------
CURRENT FOCUS
--------------------------------------------------------------------------------
Active Track: dashboard_20250112 - Dashboard Feature
Current Phase: Phase 2: Core Components
Current Task: [~] Task 2.3: Implement chart rendering
Progress in Phase:
- [x] Task 2.1: Create dashboard layout
- [x] Task 2.2: Add data fetching hooks
- [~] Task 2.3: Implement chart rendering
- [ ] Task 2.4: Add filter controls
--------------------------------------------------------------------------------
NEXT ACTIONS
--------------------------------------------------------------------------------
1. Complete: Task 2.3 - Implement chart rendering (dashboard_20250112)
2. Then: Task 2.4 - Add filter controls (dashboard_20250112)
3. After Phase 2: Phase verification checkpoint
--------------------------------------------------------------------------------
BLOCKERS
--------------------------------------------------------------------------------
{If blockers found:}
! BLOCKED: Task 3.1 in dashboard_20250112 depends on api_20250111 (incomplete)
{If no blockers:}
No blockers identified.
================================================================================
Commands: /conductor:implement {trackId} | /conductor:new-track | /conductor:revert
================================================================================
Single Track Status (with track-id argument)
code
================================================================================
TRACK STATUS: {Track Title}
================================================================================
Track ID: {trackId}
Type: {feature|bug|chore|refactor}
Status: {Pending|In Progress|Complete}
Created: {date}
Updated: {date}
--------------------------------------------------------------------------------
SPECIFICATION
--------------------------------------------------------------------------------
Summary: {brief summary from spec.md}
Acceptance Criteria:
- [x] {Criterion 1}
- [ ] {Criterion 2}
- [ ] {Criterion 3}
--------------------------------------------------------------------------------
IMPLEMENTATION
--------------------------------------------------------------------------------
Overall: {completed}/{total} tasks ({percentage}%)
Progress: [##########..........] {percentage}%
## Phase 1: {Phase Name} [COMPLETE]
- [x] Task 1.1: {description}
- [x] Task 1.2: {description}
- [x] Verification: {description}
## Phase 2: {Phase Name} [IN PROGRESS]
- [x] Task 2.1: {description}
- [~] Task 2.2: {description} <-- CURRENT
- [ ] Task 2.3: {description}
- [ ] Verification: {description}
## Phase 3: {Phase Name} [PENDING]
- [ ] Task 3.1: {description}
- [ ] Task 3.2: {description}
- [ ] Verification: {description}
--------------------------------------------------------------------------------
GIT HISTORY
--------------------------------------------------------------------------------
Related Commits:
abc1234 - feat: add login form ({trackId})
def5678 - feat: add password validation ({trackId})
ghi9012 - chore: mark task 1.2 complete ({trackId})
--------------------------------------------------------------------------------
NEXT STEPS
--------------------------------------------------------------------------------
1. Current: Task 2.2 - {description}
2. Next: Task 2.3 - {description}
3. Phase 2 verification pending
================================================================================
Commands: /conductor:implement {trackId} | /conductor:revert {trackId}
================================================================================
Status Markers Legend
Display at bottom if helpful:
code
Legend: [x] = Complete [~] = In Progress [ ] = Pending [!] = Blocked
Error States
No Tracks Found
code
================================================================================
PROJECT STATUS: {Project Name}
================================================================================
Conductor is set up but no tracks have been created yet.
To get started:
/conductor:new-track "your feature description"
================================================================================
Conductor Not Initialized
code
ERROR: Conductor not initialized Could not find conductor/product.md Run /conductor:setup to initialize Conductor for this project.
Track Not Found (with argument)
code
ERROR: Track not found: {argument}
Available tracks:
- auth_20250115
- dashboard_20250112
- nav-fix_20250114
Usage: /conductor:status [track-id]
Calculation Logic
Task Counting
code
For each plan.md: - Complete: count lines matching /^- \[x\] Task/ - In Progress: count lines matching /^- \[~\] Task/ - Pending: count lines matching /^- \[ \] Task/ - Total: Complete + In Progress + Pending
Phase Detection
code
Current phase = first phase header followed by any incomplete task ([ ] or [~])
Progress Bar
code
filled = floor((completed / total) * 20) empty = 20 - filled bar = "[" + "#".repeat(filled) + ".".repeat(empty) + "]"
Quick Mode
If invoked with --quick or -q:
code
{Project Name}: {completed}/{total} tasks ({percentage}%)
Active: {trackId} - Task {X.Y}
JSON Output
If invoked with --json:
json
{
"project": "{name}",
"timestamp": "ISO_TIMESTAMP",
"tracks": {
"total": N,
"completed": X,
"in_progress": Y,
"pending": Z
},
"tasks": {
"total": M,
"completed": A,
"in_progress": B,
"pending": C
},
"current": {
"track": "{trackId}",
"phase": N,
"task": "{X.Y}"
},
"blockers": []
}
🏰 Rei Skills — Curated by Rootcastle Engineering & Innovation | Batuhan Ayrıbaş
Engineering Beyond Boundaries | admin@rootcastle.com