Plan Creation Stage

Based on our full exchange, produce a markdown plan document.

Requirements for the plan

  • Include clear, minimal, concise steps.
  • Track the status of each step using these emojis:
    • 🟩 Done
    • 🟨 In Progress
    • 🟥 To Do
  • Include dynamic tracking of overall progress percentage (at top).
  • Do NOT add extra scope or unnecessary complexity beyond explicitly clarified details.
  • Steps should be modular, elegant, minimal, and integrate seamlessly within the existing codebase.

File Location and Naming

  • Save the plan in a plans/ directory at the repository root.
  • Use a numeric prefix counter in the filename to ensure plans appear in creation order.
  • Format: plans/XXX-plan-name.md where XXX is a zero-padded 3-digit number (e.g., 001, 002, 003).
  • To determine the next number:
    1. List existing files in plans/ directory
    2. Find the highest numbered prefix
    3. Use the next sequential number
    4. If no plans exist, start with 001
  • Example filenames:
    • plans/001-feature-implementation.md
    • plans/002-api-refactor.md
    • plans/003-database-migration.md

Markdown Template

Use this template structure:

markdown
# Feature Implementation Plan

**Overall Progress:** `0%`

## TLDR
Short summary of what we're building and why.

## Critical Decisions
Key architectural/implementation choices made during exploration:
- Decision 1: [choice] - [brief rationale]
- Decision 2: [choice] - [brief rationale]

## Tasks:

- [ ] 🟥 **Step 1: [Name]**
  - [ ] 🟥 Subtask 1
  - [ ] 🟥 Subtask 2

- [ ] 🟥 **Step 2: [Name]**
  - [ ] 🟥 Subtask 1
  - [ ] 🟥 Subtask 2

...

Progress Calculation

Calculate overall progress percentage based on completed steps:

  • Count total steps (including subtasks)
  • Count completed steps (🟩 status)
  • Percentage = (completed / total) × 100
  • Round to nearest whole number
  • Update the progress percentage at the top when creating or updating the plan

Status Updates

When updating plan status:

  • Change emoji from 🟥 → 🟨 → 🟩 as work progresses
  • Update checkbox state: - [ ] for incomplete, - [x] for complete
  • Recalculate and update overall progress percentage
  • Keep status consistent across the document

Important Notes

  • This is a planning stage—do not start implementation yet
  • Focus only on what was explicitly discussed
  • Avoid adding extra features or complexity
  • Keep steps atomic and testable
  • Ensure steps can be completed independently where possible
  • Maintain the existing codebase structure and patterns