Feature Acceptance
Systematic approach to verifying features meet requirements before release.
Acceptance Criteria
SMART Criteria
Every acceptance criterion should be:
- •Specific - Clear, unambiguous requirement
- •Measurable - Verifiable pass/fail condition
- •Achievable - Technically feasible
- •Relevant - Tied to user value
- •Testable - Can be validated
Given-When-Then Format
gherkin
Scenario: User creates a new project Given I am logged in as a user And I am on the dashboard When I click "New Project" And I enter "My Project" as the name And I click "Create" Then I should see "My Project" in my project list And I should be redirected to the project page
Testing Categories
Functional Testing
Verify the feature works as specified:
- • Happy path works correctly
- • All specified use cases covered
- • Input validation functions properly
- • Error handling works as expected
- • Edge cases handled appropriately
Integration Testing
Verify the feature works with existing systems:
- • API endpoints respond correctly
- • Database operations succeed
- • Third-party integrations work
- • Events/webhooks fire correctly
- • Cache invalidation works
User Experience Testing
Verify the feature is usable:
- • UI matches designs/mockups
- • Loading states are shown
- • Error messages are helpful
- • Accessibility requirements met
- • Responsive on all target devices
Performance Testing
Verify the feature performs acceptably:
- • Response times within SLA
- • No memory leaks
- • Handles expected load
- • Graceful degradation under stress
Security Testing
Verify the feature is secure:
- • Authentication required where needed
- • Authorization enforced
- • Input sanitization in place
- • No sensitive data exposed
- • Audit logging functional
Acceptance Process
1. Pre-Review
Developer self-check before review:
code
[ ] Code complete and tested [ ] Unit tests written and passing [ ] Integration tests passing [ ] Documentation updated [ ] No console errors/warnings [ ] Performance acceptable
2. Peer Review
Code review by team member:
code
[ ] Code quality acceptable [ ] Logic is correct [ ] Tests are comprehensive [ ] No security concerns [ ] Follows team conventions
3. QA Review
Formal testing by QA:
code
[ ] All acceptance criteria verified [ ] Edge cases tested [ ] Cross-browser/device testing [ ] Regression testing passed [ ] Test cases documented
4. Stakeholder Review
Product/design verification:
code
[ ] Matches requirements [ ] UX acceptable [ ] No scope creep [ ] Ready for users
Test Case Template
markdown
**Test Case:** TC-001 **Feature:** User Login **Scenario:** Successful login with valid credentials **Preconditions:** - User account exists - User is not logged in **Test Steps:** 1. Navigate to login page 2. Enter valid email 3. Enter valid password 4. Click "Log In" **Expected Result:** - User is logged in - Redirected to dashboard - Welcome message displayed **Actual Result:** [To be filled during testing] **Status:** [ ] Pass [ ] Fail **Notes:** [Any observations]
Defect Tracking
Severity Levels
| Level | Definition | Response |
|---|---|---|
| Critical | System unusable, data loss | Fix immediately |
| High | Major feature broken | Fix before release |
| Medium | Feature impaired but usable | Fix soon |
| Low | Minor issue, workaround exists | Fix when possible |
Defect Template
markdown
**Title:** Brief description **Severity:** Critical/High/Medium/Low **Environment:** Browser, OS, version **Steps to Reproduce:** 1. Step one 2. Step two 3. Step three **Expected:** What should happen **Actual:** What actually happened **Screenshots:** [Attach if applicable]
Release Criteria
Definition of Done
Feature is complete when:
- • All acceptance criteria pass
- • No critical or high defects
- • Test coverage meets threshold
- • Documentation complete
- • Performance requirements met
- • Security review passed
- • Stakeholder sign-off received
Go/No-Go Decision
| Criterion | Status | Notes |
|---|---|---|
| Functional tests | ✅ Pass | All 24 scenarios pass |
| Performance | ⚠️ Partial | 95% within SLA |
| Security | ✅ Pass | No vulnerabilities |
| Documentation | ✅ Pass | Updated |
| Stakeholder | ⏳ Pending | Meeting scheduled |
Decision: [ ] Go [ ] No-Go