Db Backup Recovery
Trigger Boundary
- •Use when schema, indexing, transaction, migration, or durability behavior is in scope.
- •Do not use for HTTP/API boundary design; use
api-*. - •Do not use for cluster provisioning details; use
infrastructure-as-codeorkubernetes-*.
Goal
Ensure data correctness, performance, and lifecycle reliability.
Inputs
- •Change scope and risk profile
- •Domain evidence for backup retention, restore reliability, and recovery time objectives
- •Operational, compliance, and rollout constraints
Outputs
- •Backup and recovery verification matrix
- •Decision log for backup retention, restore reliability, and recovery time objectives
- •Verification checklist with measurable pass-fail criteria
Workflow
- •Clarify outcomes and hard constraints for backup retention, restore reliability, and recovery time objectives.
- •Produce options and select an approach for backup retention, restore reliability, and recovery time objectives.
- •Evaluate trade-offs across security, performance, operability, and maintainability.
- •Verify decisions using periodic restore drills with RPO/RTO evidence.
- •Publish decisions, residual risks, and accountable follow-up actions.
Quality Gates
- •Scope and assumptions for backup retention, restore reliability, and recovery time objectives are explicit and reviewable.
- •Decision rationale is backed by evidence instead of preference.
- •Rollout and rollback criteria are defined when production impact exists.
- •Residual risks have owners, due dates, and verification steps.
Failure Handling
- •Stop when restore procedures are untested or RPO/RTO targets are unmet.
- •Escalate when accepted risk exceeds team policy thresholds.