dev.integration-check
Pre-PR validation to ensure feature is ready for review
When to Use
Use this skill when:
- •All tasks for a feature are complete
- •Before creating a pull request
- •As a final quality gate before merge
- •To validate end-to-end functionality
Invocation
/dev.integration-check [options]
Options:
- •
--fix- Attempt to auto-fix issues - •
--verbose- Show detailed output
Prerequisites
- •Must be on a feature branch (e.g.,
ep01-feature-name) - •All implementation tasks should be complete
- •Code should be committed
Workflow
Phase 1: Load Context
SCRIPT_DIR="$(dirname "$0")/scripts" source "$SCRIPT_DIR/common.sh" eval "$(get_feature_paths)"
Read:
- •
spec.md- Requirements and acceptance criteria - •
tasks.md- Verify all tasks completed - •
.linear-mapping.json- Check Linear status - •
checklists/review.md- Review criteria
Phase 2: Task Completion Check
Verify all tasks are done:
Task Completion: ✓ T001 - Create project structure ✓ T002 - Initialize configuration ... ✗ T045 - Update documentation (INCOMPLETE) Status: 44/45 tasks complete
If incomplete tasks exist, list them and their Linear status.
Phase 3: Code Quality Checks (ZERO TOLERANCE)
CRITICAL: The quality bar is absolute. No exceptions.
Run ALL project validation tools - ALL MUST PASS WITH ZERO ERRORS:
# Type checking - ZERO errors allowed bun run typecheck # Linting - ZERO errors allowed bun run lint # Format check - MUST pass bun run format:check # Tests - ZERO failures allowed (NEVER use raw `bun test`) bun run test # Build - MUST succeed bun run build
Report results (ALL must show ✓):
Code Quality (ZERO TOLERANCE): ✓ Types: 0 errors (REQUIRED) ✓ Lint: 0 errors (REQUIRED) ✓ Format: Pass (REQUIRED) ✓ Tests: X/X pass, 0 fail (REQUIRED) ✓ Build: Pass (REQUIRED)
FAILURE RESPONSE:
- •If ANY check shows errors → FAIL the integration check
- •Do NOT proceed to Phase 4 until all errors are fixed
- •Do NOT accept "warnings only" - all errors must be zero
- •Pre-existing issues are NOT acceptable - fix all identified issues
Type safety is CRITICAL - this is why we chose TypeScript:
- •TypeScript errors are NOT optional to fix
- •ESLint errors are NOT optional to fix
- •The quality bar is absolute
Phase 3.5: Integration Wiring Verification (CRITICAL)
CRITICAL: Features must be USED, not just BUILT.
This phase verifies that built components are actually integrated into the system. A component that compiles and passes tests but is never called is a failed delivery.
Step 3.5.1: Exported Symbol Analysis
For each new/modified TypeScript file:
# Find all exports from changed files git diff --name-only main...HEAD | grep '\.tsx\?$' | while read file; do grep -E "^export (function|const|class|interface|type)" "$file" done
Step 3.5.2: Import Verification
For each export, verify it is imported somewhere in src/:
grep -r "from ['\""].*${module}['\"]" src/ --include="*.ts" --include="*.tsx"
Red Flags (AUTO-FAIL):
- •Exported React component never imported in src/
- •Exported function never called anywhere
- •Index file exports symbols never imported elsewhere
Step 3.5.3: Entry Point Path Verification
For UI components, verify path to entry point:
- •Ink components → must reach
render(<Component>)call - •CLI commands → must be registered in
program.ts - •Tools → must be registered in tool registry
Output Format
Integration Wiring: Exports Found: 15 symbols across 5 files Imports Verified: 12/15 (80%) UNINTEGRATED (AUTO-FAIL): ✗ App.tsx exports App → NOT IMPORTED ✗ Progress.tsx exports Progress → NOT IMPORTED Integration Status: FAIL (2 unintegrated exports)
FAILURE RESPONSE:
- •ANY unintegrated export → FAIL the integration check
- •This is NOT a warning - unintegrated code is a delivery failure
Phase 4: Acceptance Criteria Validation
For each user story in spec.md:
- •List acceptance criteria
- •Map to test results or manual verification
- •Mark pass/fail
Acceptance Criteria:
US1: User can analyze code
✓ Given valid code, when analyzed, then returns results
✓ Given invalid code, when analyzed, then returns error
✓ Analysis completes in < 5 seconds
US2: User can export results
✓ Given results, when exported, then creates valid JSON
✗ Given results, when exported to CSV, then creates valid CSV
→ Not implemented (P2, deferred)
Phase 5: Constitution Compliance
Validate against project principles:
Constitution Compliance: | Principle | Status | Notes | |-----------|--------|-------| | I. Truthfulness | ✓ | No misleading outputs | | II. Constraint-Aware | ✓ | Respects memory limits | | III. Causal-First | ✓ | Requirements traced | | IV. Minimal | ✓ | No over-engineering | | V. Debuggable | ✓ | Logs and errors clear | | VI. Traceable | ✓ | Task IDs in commits | | VII. Consistent | ✓ | Follows patterns | | VIII. Conventional | ✓ | Standard formatting | | IX. Agent-Aware | ✓ | Structured outputs |
Phase 6: Linear Sync Check
Verify Linear state matches reality:
mcp__linear__list_issues({project: projectId})
Linear Sync:
✓ All completed tasks marked Done in Linear
✓ All closure comments present
✗ T045 still "In Progress" but tasks.md shows incomplete
Phase 7: Generate Report
Create comprehensive integration report:
# Integration Check Report > Feature: EP01 - Core Foundation > Branch: ep01-core-foundation > Date: 2026-01-15 ## Summary | Category | Status | Details | |----------|--------|---------| | Tasks | ✓ | XX/XX complete (ALL required) | | Types | ✓ | 0 errors (ZERO tolerance) | | Lint | ✓ | 0 errors (ZERO tolerance) | | Tests | ✓ | XX/XX pass, 0 fail | | Build | ✓ | Pass | | Wiring | ✓ | X/X exports integrated (ZERO orphans) | | Acceptance | ✓ | X/X criteria met | | Constitution | ✓ | All principles pass | | Linear Sync | ✓ | All synced | **Overall Status**: READY FOR MERGE (or BLOCKED if ANY errors) **NOTE**: Any status showing ⚠️ or ✗ for Types, Lint, Tests, or Wiring = BLOCKED. The quality bar is absolute - we do NOT accept issues or unintegrated code into main. ## Blockers None ## Warnings 1. Task T045 incomplete - documentation update 2. US2 AC3 deferred to next iteration ## Recommendations 1. Complete T045 or explicitly defer 2. Document deferred criteria in PR description 3. Create follow-up issue for US2 AC3
Output
On completion:
Integration check complete!
Feature: EP01 - Core Foundation
Status: READY WITH WARNINGS
Summary:
Tasks: 44/45 ✓
Types: Pass ✓
Lint: Pass ✓
Tests: 45/45 ✓
Build: Pass ✓
Wiring: 15/15 ✓
Acceptance: 8/9 ⚠️
Constitution: Pass ✓
Linear: Synced ✓
Warnings: 2
- T045 incomplete
- US2 AC3 deferred
Report: specs/ep01-core-foundation/integration-report.md
Ready for PR with noted warnings.
Constitution Alignment
This skill supports:
- •I. Truthfulness: Honest quality assessment
- •V. Debuggable: Clear failure reporting
- •VII. Consistent: Standardized checks
- •IX. Agent-Aware: Structured validation
Handoff
After passing checks, suggest:
- •
/dev.pr- Create pull request with Linear integration - •
/arch-review- If significant architecture changes made